jinnuo mould metal leg chair mould

FOB Reference Price:Get Latest Price
US $30,000-45,000 / Sets | 1 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Jinnuo Mould
Model Number:
JN012
Shaping Mode:
Plastic Injection Mould
Product Material:
Plastic
Product:
Household Product
mould life:
500,000 shot
Supply Ability
Supply Ability:
200 Set/Sets per Year
Packaging & Delivery
Packaging Details
wooden box
Port
Ningbo
Lead Time :
60 days

metal leg rattan chair mould

 

Mould base

Cav/core insert

Products material

No of cavity

P20,45#

P20,2316, H718…

plastic

1/muti

No of parting surface

Runner system

Products size

Gate type

1/muti

Cold/hot

any sizes

Depend on drawing

 

Our advantage:
1. High quality
2. Cheap price
3. Short delivery time
4. Excellent seivice

 

Mold's life can be 300000 to 500000 shots.  No flash,except human erro.

 

Pls contact Judy (+86 138 5761 3213 ) if you need any moulds.

S k y p e : jennycdl

 

The main injection mould we manufacture are as follows:

  1. Home Appliance Series, such as TV front cover, TV rear cover, Display cover, Air-conditioner or Refrigerator’s plastic parts, Washing machine part ;
  2. Household Commodity Series, such as Plastic Chair, Plastic Table, Baby Tub, Plastic Basin, Flower Pot, Plastic Container, Shopping Basket, Laundry Basket, Plastic Box;
  3. Logistic Series, such as Crate, Wastebin, Plastic Pallet;
  4. Automobile Series, such as Auto inner parts, Bumper, Instrument Panel, Door Plate, complete sets of Motorcycle parts and so on.

Maintenance of the injection mould:

1)   before working

a:clean up the mould surface and make sure cool system is in good quality.

b:inspect the runner sprue,make sure it can work well.

2)  during working

a:exam the guide pin,guide bush,slide, oil the mould two times a day.

b:inspect the parting line,ejector tank,and runner surface

c:inspect the cool system,screw

d:exam the locating switch

2)    after working

cool system must be closed before it discharged from the injection machine.clean up the surplus water in the mould,inspect the mould surface make sure there is not any remnants and oil the working part.

79.jpg77.jpg77-1.jpgIMG_2914.JPGIMG_2915.JPGIMG_2916.JPG03-1.jpg04-2.jpg05-1 chinaplas 2018-2.jpg06-2.jpg07-2.jpg07-3.jpg08.jpg